


5
With a 35% discount for cash, a ground chalet with full finishing in a prime location in Ras El Bar - Doray Bay Ras El Bar
Partnership between MBG Developments and the Urban Communities Authority
Exceptional location:
• On a waterfront of 1 km long.
• The first tourist promenade in the Delta.
• 24-hour security and guarding.
Real ownership for a lifetime:
• It is not a usufruct right, but full ownership of the land and unit.
• Each client has a share in the land.
• The project is based on Ministerial Decision No. 1208 dated 19/10/2024.
Global engineering design:
• Design: Yasser Al-Beltagi + Hany Saad.
• Supervision: Moharram Bekhume Office.
• Wide distances between units (up to 30 meters).
• Landscaping ratio: 80%.
Quality assurance in construction:
• Precise engineering supervision to avoid any cracks or subsidence.
• The company issues a validity certificate for each building.
Types of units:
• Studios, apartments, duplexes, villas, and palaces.
• Areas ranging from 45m² to 210m².
• All units with Schindler elevators and large terraces.
Available services:
• Private beach
• Recreational promenade
• Commercial mall
• Gym and spa
• Padel Tennis courts
• Club Carts
• Artificial lakes and swimming pools
• Children's areas
• 24-hour security
Execution works:
• Soil testing
• Deep excavation
• Groundwater lowering (Dewatering)
• Replacing with high-quality soil
• Pouring more than 20,000 m³ of concrete
Beach opening:
• Soft Opening Summer 2025
• Full opening Summer 2026
• Huge celebration next July
Payment systems
15% down payment
10% completion down payment after 3 months
and the remaining over 4 years
15% discount
————————————-
25% down payment
the remaining over 5 years
15% discount
————————————-
15% down payment
10% after 3 months
the remaining over 6 years
5% discount
————————————-
35% cash discount
Exceptional location:
• On a waterfront of 1 km long.
• The first tourist promenade in the Delta.
• 24-hour security and guarding.
Real ownership for a lifetime:
• It is not a usufruct right, but full ownership of the land and unit.
• Each client has a share in the land.
• The project is based on Ministerial Decision No. 1208 dated 19/10/2024.
Global engineering design:
• Design: Yasser Al-Beltagi + Hany Saad.
• Supervision: Moharram Bekhume Office.
• Wide distances between units (up to 30 meters).
• Landscaping ratio: 80%.
Quality assurance in construction:
• Precise engineering supervision to avoid any cracks or subsidence.
• The company issues a validity certificate for each building.
Types of units:
• Studios, apartments, duplexes, villas, and palaces.
• Areas ranging from 45m² to 210m².
• All units with Schindler elevators and large terraces.
Available services:
• Private beach
• Recreational promenade
• Commercial mall
• Gym and spa
• Padel Tennis courts
• Club Carts
• Artificial lakes and swimming pools
• Children's areas
• 24-hour security
Execution works:
• Soil testing
• Deep excavation
• Groundwater lowering (Dewatering)
• Replacing with high-quality soil
• Pouring more than 20,000 m³ of concrete
Beach opening:
• Soft Opening Summer 2025
• Full opening Summer 2026
• Huge celebration next July
Payment systems
15% down payment
10% completion down payment after 3 months
and the remaining over 4 years
15% discount
————————————-
25% down payment
the remaining over 5 years
15% discount
————————————-
15% down payment
10% after 3 months
the remaining over 6 years
5% discount
————————————-
35% cash discount
Property Information
- TypeChalet
- PurposeFor Sale
- Reference no.Bayut - 5000950-r3UikD
- CompletionReady
- FurnishingUnfurnished
- Added on15 October 2025
- OwnershipPrimary
Trends
Mortgage
Location & Nearby
Location
Schools
Restaurants
Hospitals
Parks