29
EGP6,090,000
EGP 52,500 monthly / 9 years
Down payment: EGP 304,500
Latin District, Alamein, North Coast, Matruh
1 Bed
1 Bath
97 Sq. M.

1-Bedroom Apartment Ready to move | Fully finished | for Sale in Latini district | Prime Location | Coastal Unit | Open view Bahary | Limited units

IL Latini district


BUA: 97 sqm
Fully Finished

  • Consists of:
  • 1 Bedroom
  • 1 Bathroom















Total area of 820,000 sqm, including excavation and dredging works for the first phase. It was noted that the total excavation volume for the lake reaches 4.6 million cubic meters, with daily execution rates increased from 30,000 to 40,000 cubic meters per day to complete the required works according to the planned timeline.
The project also includes the construction of a main lifting station in New Marina with a capacity of 72,000 cubic meters per day, along with a discharge pipeline from the station and an irrigation pipeline.
Include the implementation of New Marina By The Lake, in addition to a 500-meter-long water tunnel, two pumping stations with a capacity of 3.25 cubic meters per second for each station, as well as pipeline networks. The New Marina By The Lake inlet project is also being carried out, along with a bridge project to connect Marina 8 with Zone 22.
Following the inspection of the Marina By The Lake project, the Prime Minister’s tour continued to the site of several ongoing efficiency upgrade and development works. He listened to an explanation from Dr. Eng. Mohamed Khalafallah, Head of the Tourist Villages Authority, regarding the expansion and efficiency upgrade works of the service road from Marina Gate 1 to Marina Gate 3, which extends for 6.1 km, as well as the development of the Champs-Élysées area.
It was also noted that development and expansion works are being resumed on the road of Zone 22, along with the development of the axes of Marina Gates 1 and 2. The Prime Minister was also briefed on the efficiency upgrade works of the Marakia and Marabella roads, as well as the status of expanding, upgrading, and restoring four bridges at the Marina El Alamein Tourist Center, in addition to the development of Marina’s entrances and the works completed so far.
The Prime Minister then moved to the project for upgrading the gates of the Marina Tourist Center, where he viewed the model for the development of Marina Gate 2, which has been completed with a 100% completion rate. He was also briefed on the progress of the upgrade works for the remaining gates of the Marina Center, from Marina Gate 1 to Marina Gate 5.

Property Information

  • TypeApartment
  • PurposeFor Sale
  • Reference no.Bayut - 5002312-9cxKa9
  • CompletionReady
  • FurnishingUnfurnished
  • Published at13 July 2026
  • OwnershipPrimary

Features / Amenities

Parking Spaces: 2
Total Floors: 7
View
Covered parking
+ 28 more amenities

Trends & Indices

*These trends are calculated using a proprietary algorithm based on prices advertised on Bayut.**Popularity is based on searches conducted by users on Bayut over the last quarter.

Mortgage

Location & Nearby

Location
Schools
Restaurants
Hospitals
Parks

Recommended for you

Factory for Sale in 6th of October, Giza - 4cb2ff8e-5812-40f2-9624-c7afb15b7b7a. jpg

EGP 10,000,000

2,300 Sq. M.

6th of October, Giza

Elhassan Raouf
Factory for Sale in Haram, Giza - IMG_3870. jpg

EGP 50,000,000

2,500 Sq. M.

Haram, Giza

Elhassan Raouf
Factory for Sale in Abu Rawash, Giza - 9. png

EGP 68,000,000

1,490 Sq. M.

Abu Rawash, Giza

Realtors